+++ K.B. Foster Civil Engineering
 























 

Mike Roberts – Senior Engineering Technician

Education
Northeastern University, 1989-1991
Mechanical Engineering studies that included courses such as Engineering Graphics, Mechanics, Strength of materials, Calculus1&2, Kinematics, Electronics and Computer programming


Technical Experience
Mike Roberts, has been working at K.B. Foster Civil Engineering, Inc. for eight years. Mike is currently responsible for several aspects of project completion both in the office and in the field including final grading, layout, road and street design and both sewer and stormwater designs. He is also often assigned the task of final plan presentation and readability, as well as project quantity takeoffs of earthwork and materials. Mr. Roberts is an expert draftsman who pays extreme attention to details. His personal quality control reduces the time and money spent on small but necessary corrections.

Mr. Roberts is becoming more involved with technical issues within the office network giving both software and hardware support for several types of computer components and systems.


Project Experience


Carnelian Bay Lake Access & Resource Enhancement
Assisted with preparation, design, and construction documents including public walk through riparian wetland areas and wildlife crossing under Highway 28.

Tahoe City Urban Improvement Project
Assisted in preparation of many aspects of the project including but not limited to; storm drain layout and profiling, parking lot design and stripping, traffic control and project phasing.

Sierra Village Apartment Homes
Involved from the initial stages of the project including surveying the site as both the rod man and the crew chief. Mike later assisted in the preparation of construction documents and design of all aspects of the project including building and parking lot layout and design, sewer system design as well as grading plans and landscaping design.

Palisades Truckee Townhomes
Prepared initial Tentative Map plans including lot layout and parcel maps, grading plan and utility plans. Assisted in design of sewer system layout and profile, site grading and water quality treatment.

Truckee Middle School
Involved in all aspects of project including road design, grading of the roads and building site, utility layout and detailing.

 

 

 



KB FOSTER CIVIL ENGINEERING INC.
P.O BOX 129 • 5193 NORTH LAKE BLVD.
CARNELIAN BAY, CA 96140
(530) 546-3381 FAX (530) 546-3380
email office@kbfoster.com


Engineering | Architecture | Surveying | Planning | Your Project | Projects
Employment | Personnel | Firm Profile | Links | Contact Us | Home